§ 02 · III — COUNSEL AREA

Lead-Based Paint

Pre-1978 properties with families in residence. Risk assessment, contractor protocol review, and independent clearance.

Lead-based paint remains present in the majority of homes built before 1978. In luxury properties where families are in residence during renovation, the risk is not theoretical — it is immediate. Dust generated during paint disturbance is the primary exposure pathway, particularly for children. We provide independent risk assessment, ensure contractor protocols meet or exceed federal and state requirements, and verify clearance before re-occupancy.

OUR PROCESS
01XRF testing and risk assessment of painted surfaces in renovation zones
02Review of contractor’s lead-safe work practices and certifications
03Development of occupant protection plan for families in residence
04On-site monitoring of dust containment and work practices
05Independent dust wipe sampling at completion of each work phase
06Clearance verification against EPA and California standards
07Written clearance report for property records
WHEN CLIENTS CALL US
  • Property built before 1978 with original paint layers
  • Renovation planned in areas with painted surfaces (windows, doors, trim, walls)
  • Children or pregnant occupants in residence during construction
  • Peeling, chipping, or deteriorating paint on interior or exterior surfaces
  • Previous renovation without documented lead testing
TYPICAL TIMELINE

Typical engagement: 4–10 weeks. Duration depends on renovation scope and number of work phases requiring clearance.

Request a Consultation →